Don't change how you estimate. Just make it faster. Schedule a demo →
Estimating & Costs

Direct Costs

Back to Glossary

Expenses that can be directly attributed to a specific project, such as labor, materials, and equipment.

Cross-check your specs, drawings, and addenda for gaps.

BidFlow reads the spec book, the drawings, and every addendum against your bid, then shows you the scope nobody covered. Catch it before you send the number, not after you sign.