Don't change how you estimate. Just make it faster. Schedule a demo →
Contracts & Legal

Request for Information (RFI)

Back to Glossary

A formal written process used by contractors to ask for clarification about contract documents, drawings, or specifications.

Cross-check your specs, drawings, and addenda for gaps.

BidFlow reads the spec book, the drawings, and every addendum against your bid, then shows you the scope nobody covered. Catch it before you send the number, not after you sign.